Recommendations

Mode
Issued Date

1763 results found. Showing page 112 of 177.

Rec. Number Issued Sort ascending Inquiry Recipient Recommendation
082/99 Rail RO-1998-117 Tranz Rail Ensure that all Circuit Marker Posts marking the track circuit approaching the Facing Points Indicators in Track Warrant areas are maintained in…
079/99 Rail RO-1999-121 Tranz Rail Take immediate steps to control the weld repair of safety critical components to recognised standards to ensure the integrity of the original…
080/99 Rail RO-1999-121 Tranz Rail Introduce operating procedures for Tranz Rail staff and customers who move wagons without using rail mounted vehicles, or load or unload wagons,…
078/99 Rail RO-1999-121 Tranz Rail Undertake an immediate inspection of all wagons utilizing this type of handgrip and remove from service those showing evidence of straightening and…
081/99 Rail RO-1999-121 Tranz Rail Introduce standards for design, inspection and repair of safety critical components which ensure they remain fit for purpose in the intended…
016/99 Rail RO-1999-103 Tranz Rail Urgently review the suitability of, and compliance with, procedures ensuring safe operation of multiple shunts between Wellington yard and the Ferry…
017/99 Rail RO-1999-103 Tranz Rail Restrict the speed on road E6 to that compatible with the line of sight available.
044/99 Rail RO-1999-107 Tranz Rail Amend existing code instructions and training procedures for the operation of remote control locomotives to ensure they include:
• a…
065/99 Rail RO-1999-111 Tranz Rail Take steps to ensure propelling movements are carried out from a safe position to control movements by line of sight, including the use of a second…
068/99 Rail RO-1999-111 Tranz Rail Reassess the desirability of permitting shunting staff to ride on the deck of certain wagons, and in particular for RCO's to control shunt…

1763 results found. Showing page 112 of 177.