Recommendations
1745 results found. Showing page 110 of 175.
Rec. Number | Issued Sort ascending | Inquiry | Recipient | Recommendation |
---|---|---|---|---|
086/99 Rail | RO-1998-117 | Tranz Rail | Implement procedures to ensure tonnage limitations are not exceeded on shunting services. | |
084/99 Rail | RO-1998-117 | Tranz Rail | Install halogen bulbs in all purple loop points indicator lights at Track Warrant Stations. | |
082/99 Rail | RO-1998-117 | Tranz Rail | Ensure that all Circuit Marker Posts marking the track circuit approaching the Facing Points Indicators in Track Warrant areas are maintained in… | |
079/99 Rail | RO-1999-121 | Tranz Rail | Take immediate steps to control the weld repair of safety critical components to recognised standards to ensure the integrity of the original… | |
080/99 Rail | RO-1999-121 | Tranz Rail | Introduce operating procedures for Tranz Rail staff and customers who move wagons without using rail mounted vehicles, or load or unload wagons,… | |
078/99 Rail | RO-1999-121 | Tranz Rail | Undertake an immediate inspection of all wagons utilizing this type of handgrip and remove from service those showing evidence of straightening and… | |
081/99 Rail | RO-1999-121 | Tranz Rail | Introduce standards for design, inspection and repair of safety critical components which ensure they remain fit for purpose in the intended… | |
016/99 Rail | RO-1999-103 | Tranz Rail | Urgently review the suitability of, and compliance with, procedures ensuring safe operation of multiple shunts between Wellington yard and the Ferry… | |
017/99 Rail | RO-1999-103 | Tranz Rail | Restrict the speed on road E6 to that compatible with the line of sight available. | |
044/99 Rail | RO-1999-107 | Tranz Rail | Amend existing code instructions and training procedures for the operation of remote control locomotives to ensure they include: • a… |
1745 results found. Showing page 110 of 175.