Recommendations

Mode
Issued Date

1705 results found. Showing page 20 of 171.

Rec. Number Issued Inquiry Recipient Sort ascending Recommendation
046/96 Rail RO-1996-108 Tranz Rail Review the procedures during programmed wheel replacement to include monitoring of the condition of the axle surface and the effectiveness of…
098/98 Rail RO-1998-112 Tranz Rail Issue instructions requiring 3.7 m logs to be suitably restrained by strops or chains when transported by standard log wagons.
046/00 Rail RO-1999-127 Tranz Rail prohibit staff members from riding motor cycles for any time they are required to maintain safe line of sight for a propelling movement when shunting…
016/03 Rail RO-2002-116 Tranz Rail Introduce procedures that define permanent, pre-determined call locations on routes under track warrant control, from where locomotive engineers must…
038/98 Rail RO-1998-104 Tranz Rail Ensures systems are in place to assess the competency of any appointed or acting Track and Structures Manager or Ganger who make such decisions.
067/99 Rail RO-1999-111 Tranz Rail Amend existing code instructions and training procedures for the operation of remote control locomotives to ensure they include a definition of what…
024/01 Rail RO-2000-118 Tranz Rail amend the Engineering Rules to ensure adequate warning of temporary speed restrictions is given to Les in a practical, effective and auditable manner…
047/96 Rail RO-1996-108 Tranz Rail Confirm the ability of existing equipment, operators and procedures to detect all cracks over 2 mm deep in the position on the axle where this…
100/98 Rail RO-1998-114 Tranz Rail Reviews the format of the train control diagram to provide improved kilometrage information on the vertical scale.
047/00 Rail RO-1999-127 Tranz Rail determine maximum allowable speeds for all shunt movements when operating in sidings, regardless of whether or not discharging or loading of wagons…

1705 results found. Showing page 20 of 171.