Recommendations
1705 results found. Showing page 5 of 171.
Rec. Number | Issued | Inquiry | Recipient Sort ascending | Recommendation |
---|---|---|---|---|
006/01 Rail | RO-2000-106 | Tranz Rail | introduce the formalised crew resource management procedures recommended in safety recommendation number 001/99, and ensure that such procedures… | |
037/03 Rail | RO-2002-121 | Tranz Rail | Ensure that the lengths of track for which track inspectors are responsible, are such that appropriate inspections can reasonably be made in the time… | |
083/95 Rail | RO-1995-114 | Tranz Rail | Develop appropriate track maintenance standards and inspection procedures governing the relative heights of converging lines. | |
059/98 Rail | RO-1998-106 | Tranz Rail | Reviews the adequacy of compliance monitoring of wagon loading. | |
024/00 Rail | RO-1999-119 | Tranz Rail | Include this accident, and the safety messages highlighted by this report, as a case study to be included in the ongoing training of the operating… | |
027/01 Rail | RO-2001-106 | Tranz Rail | issue instructions to reinforce to all operating, maintenance and protection staff that the safe operation of any protected worksite must take… | |
050/97 Rail | RO-1996-116 | Tranz Rail | Review the suitability of procedures for disseminating the requirements of standards to those responsible for compliance, and take such steps as are… | |
117/98 Rail | RO-1998-119 | Tranz Rail | Modify the control system and the procedures on DMUs to ensure that they are held under sufficient braking to prevent movement due to transmission… | |
007/01 Rail | RO-2000-106 | Tranz Rail | change the procedures for introducing rule and regulation amendments to ensure staff are fully conversant with such changes prior to introduction,… | |
038/03 Rail | RO-2002-121 | Tranz Rail | Critically evaluate the track maintenance regime for the entire rail network to ensure that track standards are maintained appropriate for the line… |
1705 results found. Showing page 5 of 171.