037/03

Recommendation Date
Recipient Name
Tranz Rail
Text
Ensure that the lengths of track for which track inspectors are responsible, are such that appropriate inspections can reasonably be made in the time available.
Reply Text
Tranz Rail accepts this recommendation.

A review of Track Inspectors areas will be carried out to ensure that workloads have been consistently and reasonably allocated.
Related Investigation(s)