Recommendations

Mode
Issued Date

1705 results found. Showing page 160 of 171.

Rec. Number Issued Inquiry Recipient Sort descending Recommendation
023/01 Rail RO-2000-118 Tranz Rail quantify the effectiveness of heat sensors at current settings to protect areas of weakness in hot weather, and if necessary lower the trigger levels…
046/96 Rail RO-1996-108 Tranz Rail Review the procedures during programmed wheel replacement to include monitoring of the condition of the axle surface and the effectiveness of…
098/98 Rail RO-1998-112 Tranz Rail Issue instructions requiring 3.7 m logs to be suitably restrained by strops or chains when transported by standard log wagons.
046/00 Rail RO-1999-127 Tranz Rail prohibit staff members from riding motor cycles for any time they are required to maintain safe line of sight for a propelling movement when shunting…
016/03 Rail RO-2002-116 Tranz Rail Introduce procedures that define permanent, pre-determined call locations on routes under track warrant control, from where locomotive engineers must…
038/98 Rail RO-1998-104 Tranz Rail Ensures systems are in place to assess the competency of any appointed or acting Track and Structures Manager or Ganger who make such decisions.
067/99 Rail RO-1999-111 Tranz Rail Amend existing code instructions and training procedures for the operation of remote control locomotives to ensure they include a definition of what…
024/01 Rail RO-2000-118 Tranz Rail amend the Engineering Rules to ensure adequate warning of temporary speed restrictions is given to Les in a practical, effective and auditable manner…
047/96 Rail RO-1996-108 Tranz Rail Confirm the ability of existing equipment, operators and procedures to detect all cracks over 2 mm deep in the position on the axle where this…
100/98 Rail RO-1998-114 Tranz Rail Reviews the format of the train control diagram to provide improved kilometrage information on the vertical scale.

1705 results found. Showing page 160 of 171.