Recommendations
1705 results found. Showing page 7 of 171.
Rec. Number | Issued | Inquiry | Recipient Sort ascending | Recommendation |
---|---|---|---|---|
068/98 Rail | RO-1998-103 | Tranz Rail | Reinforces procedures to prevent unauthorised modifications by field staff to overcome design deficiencies. | |
064/99 Rail | RO-1999-111 | Tranz Rail | Liase with CHH and incorporate procedures in the "Railway Operating Plan" which control CHH operations (and its subsidiaries) adjacent to… | |
021/01 Rail | RO-2000-118 | Tranz Rail | quantify lengths of CWR that have an unknown neutral temperature and ensure they are assessed, and protected where appropriate until destressing can… | |
095/98 Rail | RO-1998-111 | Tranz Rail | In conjunction with the appropriate local authorities reviews the effectiveness of the current policy with respect to the provision and maintenance… | |
027/00 Rail | RO-1999-125 | Tranz Rail | Audit the distribution and supply of information bulletins to ensure only current versions are available to LEs and operating staff. | |
069/98 Rail | RO-1998-103 | Tranz Rail | Reviews the acceptability of the relocated spigots as a safe stowage for transition heads on QR and DQ locomotives. | |
065/99 Rail | RO-1999-111 | Tranz Rail | Take steps to ensure propelling movements are carried out from a safe position to control movements by line of sight, including the use of a second… | |
022/01 Rail | RO-2000-118 | Tranz Rail | introduce alignment control procedures to ensure maintenance tamping does not result in an effective uncontrolled lowing of the neutral temperature… | |
044/96 Rail | RO-1996-108 | Tranz Rail | Dismantle and inspect for fatigue cracks as a matter of urgency all axles under the three axle bogies currently in service on the Silver Fern.… | |
035/00 Rail | RO-1999-125 | Tranz Rail | Implement procedures to ensure that the requirements for persons in charge of obstructed sections to not obstruct the line until satisfied that any… |
1705 results found. Showing page 7 of 171.