Recommendations
1705 results found. Showing page 158 of 171.
Rec. Number | Issued | Inquiry | Recipient Sort descending | Recommendation |
---|---|---|---|---|
021/00 Rail | RO-1999-119 | Tranz Rail | Ensure that procedures for dealing with stalled trains are understood and adhered to by all operating staff. | |
068/01 Rail | RO-2001-104 | Tranz Rail | Replace the current multi-choice track warrant theory recertification examination for locomotive engineers with a more comprehensive examination… | |
086/99 Rail | RO-1998-117 | Tranz Rail | Implement procedures to ensure tonnage limitations are not exceeded on shunting services. | |
005/01 Rail | RO-2000-105 | Tranz Rail | Introduce code procedures for the use of the EM80 recording car on important yard roads covering: • tracks to be inspected •… |
|
036/03 Rail | RO-2002-121 | Tranz Rail | Develop guidelines for the track inspectors to determine when timber sleepers are no longer suitable for continued service. | |
022/00 Rail | RO-1999-119 | Tranz Rail | Revise the procedures for tagging downrated locomotives to include a formal process to have them entered into the computerised tonnage control system… | |
069/01 Rail | RO-2001-104 | Tranz Rail | Develop a separate track warrant theory recertification examination for train controllers, which covers all relevant track warrant rules and… | |
116/98 Rail | RO-1998-119 | Tranz Rail | Emphasise to all Tranz Rail staff involved in passenger operations the importance of the existing procedures that provide for the safety of… | |
006/01 Rail | RO-2000-106 | Tranz Rail | introduce the formalised crew resource management procedures recommended in safety recommendation number 001/99, and ensure that such procedures… | |
037/03 Rail | RO-2002-121 | Tranz Rail | Ensure that the lengths of track for which track inspectors are responsible, are such that appropriate inspections can reasonably be made in the time… |
1705 results found. Showing page 158 of 171.