Recommendations

Mode
Issued Date

1705 results found. Showing page 13 of 171.

Rec. Number Issued Inquiry Recipient Sort ascending Recommendation
043/01 Rail RO-2000-123 Tranz Rail ensure that following initial training and certification, new entrant train controllers do not commence training on another train control desk until…
047/96 Rail RO-1996-108 Tranz Rail Confirm the ability of existing equipment, operators and procedures to detect all cracks over 2 mm deep in the position on the axle where this…
100/98 Rail RO-1998-114 Tranz Rail Reviews the format of the train control diagram to provide improved kilometrage information on the vertical scale.
047/00 Rail RO-1999-127 Tranz Rail determine maximum allowable speeds for all shunt movements when operating in sidings, regardless of whether or not discharging or loading of wagons…
101/98 Rail RO-1998-114 Tranz Rail As part of the review of the train control diagram format, introduces a formalised system to ensure that plotted track occupation limits are subject…
125/00 Rail RO-2000-101 Tranz Rail as a matter of urgency make the use of signal blocking command “control tags” mandatory on signals controlling the entry of trains into sections…
018/03 Rail RO-2002-116 Tranz Rail Take steps to improve the effectiveness of Tranz Rail’s track warrant compliance monitoring regime in identifying repeated non-compliances at an…
003/00 Rail RO-1999-113 Tranz Rail Improve the effectiveness of detecting and reporting procedures for potential obstructions to rail traffic to ensure that such obstructions are…
044/01 Rail RO-2000-123 Tranz Rail include an area familiarisation trip with an experienced train controller or similarly qualified person as part of the training and certification for…
048/96 Rail RO-1996-108 Tranz Rail Establish the service stresses being developed in the driven axle of the three axle bogie, and from this determine the related fatigue crack growth…

1705 results found. Showing page 13 of 171.