Recommendations

Mode
Issued Date

1705 results found. Showing page 8 of 171.

Rec. Number Issued Inquiry Recipient Sort ascending Recommendation
047/96 Rail RO-1996-108 Tranz Rail Confirm the ability of existing equipment, operators and procedures to detect all cracks over 2 mm deep in the position on the axle where this…
100/98 Rail RO-1998-114 Tranz Rail Reviews the format of the train control diagram to provide improved kilometrage information on the vertical scale.
047/00 Rail RO-1999-127 Tranz Rail determine maximum allowable speeds for all shunt movements when operating in sidings, regardless of whether or not discharging or loading of wagons…
017/03 Rail RO-2002-116 Tranz Rail Take steps to identify and correct the repetitive non-compliance with Tranz Rail's rules and procedures for safe operation identified during the…
001/02 Marine MO-2001-211 Tranz Rail Introduce a policy that when replacement parts are required for any life-saving appliances or safety equipment, only parts made or approved by the…
039/98 Rail RO-1998-104 Tranz Rail Ensures that any necessary track geometry improvements required following derailments which show obvious signs of likely track related factors are…
068/99 Rail RO-1999-111 Tranz Rail Reassess the desirability of permitting shunting staff to ride on the deck of certain wagons, and in particular for RCO's to control shunt…
043/01 Rail RO-2000-123 Tranz Rail ensure that following initial training and certification, new entrant train controllers do not commence training on another train control desk until…
048/96 Rail RO-1996-108 Tranz Rail Establish the service stresses being developed in the driven axle of the three axle bogie, and from this determine the related fatigue crack growth…
101/98 Rail RO-1998-114 Tranz Rail As part of the review of the train control diagram format, introduces a formalised system to ensure that plotted track occupation limits are subject…

1705 results found. Showing page 8 of 171.