Recommendations

Mode
Issued Date

1705 results found. Showing page 164 of 171.

Rec. Number Issued Inquiry Recipient Sort descending Recommendation
054/98 Rail RO-1998-109 Tranz Rail Reviews the adequacy of existing incident reporting procedures to identify recurring problems and initiate appropriate follow up action.
017/02 Rail RO-2002-101 Tranz Rail Take immediate steps to institute an inspection/protection regime at the south abutment of Bridge 57 over the Rangitata River which:
074/97 Rail RO-1997-109 Tranz Rail Take action to restrict movements through the crossover at the south end of Te Kauwhata, such that signal 59006 is not required to give a medium…
016/99 Rail RO-1999-103 Tranz Rail Urgently review the suitability of, and compliance with, procedures ensuring safe operation of multiple shunts between Wellington yard and the Ferry…
004/01 Rail RO-2000-111 Tranz Rail introduce a system to ensure road knowledge certification is for a limited, finite time and that subsequent recertification requires a defined…
005/04 Rail RO-2003-104 Tranz Rail Reinforce with all train controllers the need to monitor actual running times against the scheduled time to complete a track section, and immediately…
004/96 Rail RO-1996-101 Tranz Rail Introduce procedures governing the issue of track warrants to require a Locomotive Engineer taking control of the train after a crew change to have…
055/98 Rail RO-1998-109 Tranz Rail Reviews the adequacy of standards and procedures relating to the operation of existing sidings on steep grades, and the installation of new sidings…
054/02 Rail RO-2002-101 Tranz Rail Introduce procedures into the leave programmes for track staff, including length gangers and track maintainers, to ensure adequate qualified staff…
075/97 Rail RO-1997-109 Tranz Rail Take appropriate action to reduce the possibility of similar incidents occurring at any other localities where adjacent signals capable of giving…

1705 results found. Showing page 164 of 171.