Recommendations

Mode
Issued Date

1705 results found. Showing page 160 of 171.

Rec. Number Issued Inquiry Recipient Sort descending Recommendation
001/99 Rail RO-1998-107 Tranz Rail Introduce formalised crew resource management training for Train Control Operators, Signalmen and LEs based on the training available in the aviation…
078/99 Rail RO-1999-121 Tranz Rail Undertake an immediate inspection of all wagons utilizing this type of handgrip and remove from service those showing evidence of straightening and…
030/02 Rail RO-2001-111 Tranz Rail Introduce changes to the existing staff training and promotion process, to ensure that prospective guards complete a predetermined length of time in…
080/97 Rail RO-1997-103 Tranz Rail Review the design and operation of the signalling and integrated level crossing protection at Trentham for up trains, with a view to reducing the…
005/00 Rail RO-1999-101 Tranz Rail Issue standards and procedures to ensure that the design, construction and repair of type 14 brake beams ensures that they are fabricated to…
124/00 Rail RO-2000-107 Tranz Rail introduce procedures for certified staff operating HRVs to also be certified as to their local knowledge of the work area involved before they are…
018/04 Rail RO-2003-102 Tranz Rail Ensure that where fitted to HRVs, seat belts must be worn by the driver and all passengers when driving on track, except in situations where…
025/96 Rail RO-1995-122 Tranz Rail Introduce procedures to record and retain all details of the fitting of new tyres for a minimum period of 10 years.
002/99 Rail RO-1998-107 Tranz Rail Reassess the Tranz Rail irregularity follow-up policy to ensure that it is positioned sufficiently towards a corrective action culture as distinct…
079/99 Rail RO-1999-121 Tranz Rail Take immediate steps to control the weld repair of safety critical components to recognised standards to ensure the integrity of the original…

1705 results found. Showing page 160 of 171.