Recommendations

Mode
Issued Date

1705 results found. Showing page 158 of 171.

Rec. Number Issued Inquiry Recipient Sort descending Recommendation
039/98 Rail RO-1998-104 Tranz Rail Ensures that any necessary track geometry improvements required following derailments which show obvious signs of likely track related factors are…
068/99 Rail RO-1999-111 Tranz Rail Reassess the desirability of permitting shunting staff to ride on the deck of certain wagons, and in particular for RCO's to control shunt…
043/01 Rail RO-2000-123 Tranz Rail ensure that following initial training and certification, new entrant train controllers do not commence training on another train control desk until…
047/96 Rail RO-1996-108 Tranz Rail Confirm the ability of existing equipment, operators and procedures to detect all cracks over 2 mm deep in the position on the axle where this…
100/98 Rail RO-1998-114 Tranz Rail Reviews the format of the train control diagram to provide improved kilometrage information on the vertical scale.
047/00 Rail RO-1999-127 Tranz Rail determine maximum allowable speeds for all shunt movements when operating in sidings, regardless of whether or not discharging or loading of wagons…
017/03 Rail RO-2002-116 Tranz Rail Take steps to identify and correct the repetitive non-compliance with Tranz Rail's rules and procedures for safe operation identified during the…
003/00 Rail RO-1999-113 Tranz Rail Improve the effectiveness of detecting and reporting procedures for potential obstructions to rail traffic to ensure that such obstructions are…
044/01 Rail RO-2000-123 Tranz Rail include an area familiarisation trip with an experienced train controller or similarly qualified person as part of the training and certification for…
048/96 Rail RO-1996-108 Tranz Rail Establish the service stresses being developed in the driven axle of the three axle bogie, and from this determine the related fatigue crack growth…

1705 results found. Showing page 158 of 171.