017/02 Rail RO-2002-101 Tranz Rail Take immediate steps to institute an inspection/protection regime at the south abutment of Bridge 57 over the Rangitata River which:
074/97 Rail RO-1997-109 Tranz Rail Take action to restrict movements through the crossover at the south end of Te Kauwhata, such that signal 59006 is not required to give a medium…
016/99 Rail RO-1999-103 Tranz Rail Urgently review the suitability of, and compliance with, procedures ensuring safe operation of multiple shunts between Wellington yard and the Ferry…
004/01 Rail RO-2000-111 Tranz Rail introduce a system to ensure road knowledge certification is for a limited, finite time and that subsequent recertification requires a defined…
005/04 Rail RO-2003-104 Tranz Rail Reinforce with all train controllers the need to monitor actual running times against the scheduled time to complete a track section, and immediately…
004/96 Rail RO-1996-101 Tranz Rail Introduce procedures governing the issue of track warrants to require a Locomotive Engineer taking control of the train after a crew change to have…
055/98 Rail RO-1998-109 Tranz Rail Reviews the adequacy of standards and procedures relating to the operation of existing sidings on steep grades, and the installation of new sidings…
054/02 Rail RO-2002-101 Tranz Rail Introduce procedures into the leave programmes for track staff, including length gangers and track maintainers, to ensure adequate qualified staff…
075/97 Rail RO-1997-109 Tranz Rail Take appropriate action to reduce the possibility of similar incidents occurring at any other localities where adjacent signals capable of giving…
017/99 Rail RO-1999-103 Tranz Rail Restrict the speed on road E6 to that compatible with the line of sight available.