Recommendations

Mode
Issued Date

1763 results found. Showing page 112 of 177.

Rec. Number Issued Sort ascending Inquiry Recipient Recommendation
085/99 Rail RO-1998-117 Tranz Rail Carry out a comparative risk analysis on the operations of indicator loops compared to loops equipped with arrival/starting signals in Track Warrant…
080/99 Rail RO-1999-121 Tranz Rail Introduce operating procedures for Tranz Rail staff and customers who move wagons without using rail mounted vehicles, or load or unload wagons,…
078/99 Rail RO-1999-121 Tranz Rail Undertake an immediate inspection of all wagons utilizing this type of handgrip and remove from service those showing evidence of straightening and…
081/99 Rail RO-1999-121 Tranz Rail Introduce standards for design, inspection and repair of safety critical components which ensure they remain fit for purpose in the intended…
079/99 Rail RO-1999-121 Tranz Rail Take immediate steps to control the weld repair of safety critical components to recognised standards to ensure the integrity of the original…
017/99 Rail RO-1999-103 Tranz Rail Restrict the speed on road E6 to that compatible with the line of sight available.
016/99 Rail RO-1999-103 Tranz Rail Urgently review the suitability of, and compliance with, procedures ensuring safe operation of multiple shunts between Wellington yard and the Ferry…
068/99 Rail RO-1999-111 Tranz Rail Reassess the desirability of permitting shunting staff to ride on the deck of certain wagons, and in particular for RCO's to control shunt…
045/99 Rail RO-1999-107 Tranz Rail Consolidate and clarify procedures to avoid conflicting movements in the Auckland Freight Centre and include procedures for the dispatch of trains.
066/99 Rail RO-1999-111 Tranz Rail Reinforce the training and increase the compliance monitoring of RCO's to ensure they are positioned and operate in such a manner that a…

1763 results found. Showing page 112 of 177.