010/03 Marine | MO-2002-208 | Holcim NZ | Instigate regular monitoring and logging of the critical operating oil pressures and flows of the controllable pitch propeller system under… | |
011/03 Marine | MO-2002-208 | Holcim NZ | Ensure that all the crew of the Westport who are responsible for the operation, maintenance and monitoring of the controllable pitch propeller system… | |
060/02 Marine | MO-2002-201 | Eastland Port | Investigate and improve the mooring system so that it is effective for the size and type of vessels expected to utilise the port. Such improvement… | |
063/02 Marine | MO-2002-201 | Eastland Port | Review the limiting dimensions of ships allowed to use the port to better reflect the PIANC guidelines. | |
066/02 Marine | MO-2002-201 | Gisborne DC (F) | Ensure that the duly appointed harbourmaster for the Port of Gisborne is employed on terms and conditions which enable him or her to properly fulfil… | |
069/02 Marine | MO-2002-201 | Gisborne Pilot | Prepare and use a comprehensive pilotage passage plan. The plan should be readily understandable and have sufficient detail to inform visiting ship’… | |
061/02 Marine | MO-2002-201 | Eastland Port | Create an auditable system for the inventory, care and maintenance of the shore mooring lines and associated spares, to ensure that the equipment is… | |
064/02 Marine | MO-2002-201 | Eastland Port | Institute standard operating procedures for maritime based activities in the port. These procedures should be prepared in conjunction with the port… | |
067/02 Marine | MO-2002-201 | Adsteam Marine (NZ) | Investigate the role of a sole pilot and provide sufficient assistance for that pilot, including regular relief pilot(s) and a system of peer support. | |
062/02 Marine | MO-2002-201 | Eastland Port | Install suitable weather, tide and swell monitoring equipment to better forecast adverse conditions. For such a system to be effective, it should be… |