Recommendations

Mode
Issued Date

1747 results found. Showing page 81 of 175.

Rec. Number Issued Sort ascending Inquiry Recipient Recommendation
011/03 Marine MO-2002-208 Holcim NZ Ensure that all the crew of the Westport who are responsible for the operation, maintenance and monitoring of the controllable pitch propeller system…
010/03 Marine MO-2002-208 Holcim NZ Instigate regular monitoring and logging of the critical operating oil pressures and flows of the controllable pitch propeller system under…
062/02 Marine MO-2002-201 Eastland Port Install suitable weather, tide and swell monitoring equipment to better forecast adverse conditions. For such a system to be effective, it should be…
065/02 Marine MO-2002-201 Eastland Port Determine the least depth of the channel to establish the maximum size of vessels. Channel depths should be confirmed at sufficiently regular…
068/02 Marine MO-2002-201 Adsteam Marine (NZ) Arrange for the Gisborne pilot to attend a Bridge Resource Management course.
060/02 Marine MO-2002-201 Eastland Port Investigate and improve the mooring system so that it is effective for the size and type of vessels expected to utilise the port. Such improvement…
063/02 Marine MO-2002-201 Eastland Port Review the limiting dimensions of ships allowed to use the port to better reflect the PIANC guidelines.
066/02 Marine MO-2002-201 Gisborne DC (F) Ensure that the duly appointed harbourmaster for the Port of Gisborne is employed on terms and conditions which enable him or her to properly fulfil…
069/02 Marine MO-2002-201 Gisborne Pilot Prepare and use a comprehensive pilotage passage plan. The plan should be readily understandable and have sufficient detail to inform visiting ship’…
061/02 Marine MO-2002-201 Eastland Port Create an auditable system for the inventory, care and maintenance of the shore mooring lines and associated spares, to ensure that the equipment is…

1747 results found. Showing page 81 of 175.