Recommendations

Mode
Issued Date

1747 results found. Showing page 146 of 175.

Rec. Number Issued Sort ascending Inquiry Recipient Recommendation
046/94 Rail RO-1993-129 NZ Rail Review passenger service timetables to ensure the elapse times take into account, the speeds necessary for Locomotive Engineers to arrive at crew…
047/94 Rail RO-1993-129 NZ Rail Encourage Locomotive Engineers to draw attention to any timetables which could not be achieved within normal running speeds.
033/94 Rail RO-1994-104 NZ Rail Review the adequacy of the current protection rules applicable to track workers.
028/94 Rail RO-1993-119 LTSA Future editions of the New Zealand Road Code contain an increased emphasis on the driving skills required, and the rules relating to, level crossings.
029/94 Rail RO-1993-119 LTSA Future editions of the Road Code draw attention to need for drivers to ensure that the sound level in their car is moderate enough to enable them to…
024/94 Rail RO-1993-119 Waikato DC They review the adequacy of the road and rail layout, the warning devices, the view lines, and the passive signs pertaining to the Bell Crossing…
027/94 Rail RO-1993-119 LTSA They advise each roading authority in New Zealand that they should consult with NZRL before revising lane markings on the approaches to level…
031/94 Rail RO-1993-125 NZ Rail Locomotive event recorders include capability to record the illumination of headlights and the sounding of the horn as well as the speed and brake…
008/94 Rail RO-1993-130 Hastings DC They design and construct an underpass in an adjacent but discreet location so that the use of the Heretaunga Street pedestrian level crossings can…
023/94 Rail RO-1993-118 NZ Rail They undertake a study of the distance between mainline and loop tracks at crossing loops to determine the risk of recurrence and accordingly whether…

1747 results found. Showing page 146 of 175.