Recommendations
1747 results found. Showing page 110 of 175.
Rec. Number | Issued Sort ascending | Inquiry | Recipient | Recommendation |
---|---|---|---|---|
083/99 Rail | RO-1998-117 | Tranz Rail | Review the desirability of requiring the LEs of passenger trains to assess stopping requirements at stations, on a location by location basis, to… | |
086/99 Rail | RO-1998-117 | Tranz Rail | Implement procedures to ensure tonnage limitations are not exceeded on shunting services. | |
084/99 Rail | RO-1998-117 | Tranz Rail | Install halogen bulbs in all purple loop points indicator lights at Track Warrant Stations. | |
082/99 Rail | RO-1998-117 | Tranz Rail | Ensure that all Circuit Marker Posts marking the track circuit approaching the Facing Points Indicators in Track Warrant areas are maintained in… | |
085/99 Rail | RO-1998-117 | Tranz Rail | Carry out a comparative risk analysis on the operations of indicator loops compared to loops equipped with arrival/starting signals in Track Warrant… | |
080/99 Rail | RO-1999-121 | Tranz Rail | Introduce operating procedures for Tranz Rail staff and customers who move wagons without using rail mounted vehicles, or load or unload wagons,… | |
078/99 Rail | RO-1999-121 | Tranz Rail | Undertake an immediate inspection of all wagons utilizing this type of handgrip and remove from service those showing evidence of straightening and… | |
081/99 Rail | RO-1999-121 | Tranz Rail | Introduce standards for design, inspection and repair of safety critical components which ensure they remain fit for purpose in the intended… | |
079/99 Rail | RO-1999-121 | Tranz Rail | Take immediate steps to control the weld repair of safety critical components to recognised standards to ensure the integrity of the original… | |
017/99 Rail | RO-1999-103 | Tranz Rail | Restrict the speed on road E6 to that compatible with the line of sight available. |
1747 results found. Showing page 110 of 175.