Recommendations
1705 results found. Showing page 15 of 171.
Rec. Number | Issued | Inquiry | Recipient Sort ascending | Recommendation |
---|---|---|---|---|
018/00 Rail | RO-1999-117 | Tranz Rail | Give increased consideration to the need for procedures and supervision which take account of the competency and experience of staff employed in all… | |
067/01 Rail | RO-2001-104 | Tranz Rail | Develop and introduce a checksheet for use by train controllers when dealing with disabled trains, to include such detail as: - the exact… |
|
068/01 Rail | RO-2001-104 | Tranz Rail | Replace the current multi-choice track warrant theory recertification examination for locomotive engineers with a more comprehensive examination… | |
085/99 Rail | RO-1998-117 | Tranz Rail | Carry out a comparative risk analysis on the operations of indicator loops compared to loops equipped with arrival/starting signals in Track Warrant… | |
038/00 Rail | RO-2000-105 | Tranz Rail | limit the use of four-wheel wagons to the carriage of homogeneous loads where the likelihood of asymmetrical loading is minimal, and give… | |
035/03 Rail | RO-2002-120 | Tranz Rail | Reinforce with operating staff the company’s procedures for reporting instances of sudden incapacitation through illness or other condition while on… | |
021/00 Rail | RO-1999-119 | Tranz Rail | Ensure that procedures for dealing with stalled trains are understood and adhered to by all operating staff. | |
022/00 Rail | RO-1999-119 | Tranz Rail | Revise the procedures for tagging downrated locomotives to include a formal process to have them entered into the computerised tonnage control system… | |
069/01 Rail | RO-2001-104 | Tranz Rail | Develop a separate track warrant theory recertification examination for train controllers, which covers all relevant track warrant rules and… | |
086/99 Rail | RO-1998-117 | Tranz Rail | Implement procedures to ensure tonnage limitations are not exceeded on shunting services. |
1705 results found. Showing page 15 of 171.