Recommendation Date
              Recipient Name
              NZTA
          Text
              The current requirements for communicating the status of main-line points at crossing stations within single-line automatic signalling territory results in a potential single point of failure where the consequences could be a high-speed rollover, derailment or collision.
          Reply Text
              We intend to work closely with ONTRACK with an aim to implementing and closing this recommendation as soon as possible. Discussion on this will commence on Wednesday 10 June 2009 and will be ongoing.
          Related Investigation(s)