Recommendations

Mode
Issued Date

1705 results found. Showing page 141 of 171.

Rec. Number Issued Inquiry Recipient Recommendation
038/94 Rail RO-1993-124 NZ Rail Investigate the practicability of introducing an intermediate speed aspect for the signals 12L and 6L at Te Kauwhata and other similar locations.
044/94 Rail RO-1993-126 NZ Rail Review the amenities available for operating staff while waiting for duty during unsociable hours, with a view to reducing the boredom and fatigue…
039/94 Rail RO-1993-124 NZ Rail Introduce inspection and maintenance procedures to ensure that the event recorders where installed on locomotives are operative while travelling on…
048/94 Rail RO-1994-108 Pleasant Point Railway Replace the tubular sight glasses in the Nathan Lubricator of locomotive D16 with borosilicate glass tubes that comply with or are similar to the…
052/94 Rail RO-1994-110 Driving Creek Railway Install an emergency sanding system to provide an alternative method of enhancing the wheel/rail adhesion should the normal sanding system fail to…
049/94 Rail RO-1994-108 Pleasant Point Railway Install a screen in front of the tubular sigh glasses on the Nathan Lubricator similar in design to the screen provided for the boiler water level…
051/94 Rail RO-1994-110 Driving Creek Railway Do not use the locomotive and carriage consist on days when there is a build-up of wet leaf litter on the rails, but instead use the articulated…
046/94 Rail RO-1993-129 NZ Rail Review passenger service timetables to ensure the elapse times take into account, the speeds necessary for Locomotive Engineers to arrive at crew…
047/94 Rail RO-1993-129 NZ Rail Encourage Locomotive Engineers to draw attention to any timetables which could not be achieved within normal running speeds.
045/94 Rail RO-1993-129 NZ Rail Investigate the practicability of "delethalising" the level crossing environment progressively be removing obsolete substantial…

1705 results found. Showing page 141 of 171.